Stat Tools

I-MR Chart

Control

Individuals and Moving Range chart for continuous data collected one observation at a time. Detects process shifts using Western Electric rules.

Data Table
Paste data directly from Excel or Google Sheets — columns and rows will be imported automatically.
#
Row
1
2
3
4
5
6
7
8
9
10
0 rows with data · 3 columns

Chart Settings

Western Electric Rules

Rule 1: Any point beyond ±3σ

Rule 2: 2 of 3 consecutive beyond ±2σ (same side)

Rule 3: 4 of 5 consecutive beyond ±1σ (same side)

Rule 4: 8 consecutive on same side of centre line

Enter your measurement data in the table, then click Generate I-MR Chart to detect process shifts and out-of-control conditions.

Minimum 7 data points required.

MBB Coach

Hi! I'm here to help you choose the right tool and interpret your results.

Master Black Belt Coach — I-MR Chart
Guidance only · No data shared

Guidance only — your analysis data stays in your browser. Nothing is sent to AI.